Our Projects
In North America and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.
Select your region:
Top aircraft engine manufacturer
Walbridge, a full-service construction company headquartered in Detroit, Michigan, was selected by Pratt & Whitney to build the structure.
Wayne Brothers rely on MevaLite and SK150 bracket application
Wayne Brothers, one of MEVA’s original customers, was awarded the fermentation tank structure for a new brewery in Columbia, SC. This brewery will be one of the largest breweries built in the United States in over 25 years. The project scope consisted of a cast-in-place tank structure that needed to be built in 90 days so that the remaining building structure could be completed on time.
Williams-Brice Stadium
Walbridge, a full-service construction company headquartered in Detroit, Michigan, was selected by Pratt & Whitney to build the structure.
Architectural wood-grain pattern
The new Otto M. Budig Theater had demanding requirements for the surface finish, requiring a wood-grain pattern that needed precise planning and an equally precise formwork solution.
Cleveland’s market square
The contractor was impressed with MEVA’s exceptional support when building this new, mixed-use development in a historic area of Cleveland.
Overcoming windy conditions
To overcome the windy conditions on the site while building a tall, complex residential tower required the use of two different formwork solutions.
Groundbreaking research plant
Pioneering research into the field of antimatter required a large yet safe enclosure in a remote area of northern Minnesota, which was built 12 meters below grade in granite rock, with composite precast and in-situ construction.
Upgrading big creek
To meet the high surface finish requirements for this project, the contractor wanted to refurbish their 20-year-old Imperial formwork.
Successful water plants
The MEVA Adjustable Radius (MAR) system was the formwork of choice when an existing water tank needed a complex upgrade.
Challenging tasks solved easily
MEVA’s KLK and MAR systems were used to tackle the complex expansion of digester tanks’ capacity in Columbus when the base of each tank was conical shaped on the inside and a custom formwork solution was required.
Sundre Raw Water Supply Reservoir
The MEVA Adjustable Radius System has proven itself in the construction of wastewater treatment plants in the USA and has also done an excellent job in Minot, North Dakota.