Our Projects

In the UK and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.

Back to top

Ecological, practical, good

A retaining wall with integrated columns was able to be installed without a crane and despite challenging site conditions by making use of MEVA’s AluFix wall formwork system.

Simple. Smart. Safe

A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA’s wall and slab formwork systems.

MAC: quick & flexible

A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.

Factory building becomes living space

MevaDec facilitates the renovation of an old building in Steyr

Fair-faced climbing

With its unique anchoring system, the MEVA MAC formwork climbing system was able to achieve a superior surface finish in the construction of Ardmore Park, Singapore.

A solid foundation

The need for a highly robust formwork system to handle the sheer volume of concrete for this project was met by MEVA’s Mammut products.

A successful debut

The strategic joint venture of Novatec-MEVA-Pilbara (NMP) has helped to build several key formwork infrastructure assets for Western Australia’s mining industry.

Climbing safely & flexibly

The MAC climbing formwork system was able to cast the curved building cores of the Ayala Triangle Gardens Diamond development in Manilla, despite the complex geometry, challenging weather conditions, and a demanding pour schedule.

Mammut XT: Quick and efficient

The large main wall construction of the new care centre was able to be built efficiently and flexibly thanks to the clever Mammut XT formwork system.

Heavy duty formwork props on display on bridge construction

Clear run to Versoud

A new bridge constructed over a railway line minimised track disruption with the Mammut 350 formwork and SecuritBasic safety system.

India’s green hotel

The 320m-tall, Palais Royale in Mumbai was India’s first green building, achieving LEED Platinum certification. MEVA’s automated climbing system (MAC) was used to ensure the project was delivered safely, efficiently and on time.

Load More
Close search and go back to site