News
Stay up to date with news, blogs and updates from MEVA in your region and around the world.
Select your region:
„Services at the highest level“
The premises used by the MEVA subsidiary in Hungary had become too small. Hence, it has now moved to a new, spacious location in Budapest that has modern equipment and offices. Mihály Botta-Dukát, managing director of MEVA Hungary since...
Fundamentally simple
Doing away with residual gaps in formwork using the compensation plate. Who is not familiar with this? When forming foundations and floor slabs, gaps remain between the formwork panels. These residual gaps must be compensated for by means of...
Expertise in bridge construction
The world of bridge construction is fascinating. No two tasks are the same, and the safety and quality requirements are challenging. The products and solutions supplied by MEVA, which are used in projects all over the world, are as...
New: AluFix Column Panels
User-friendliness and flexibility are the hallmarks of MEVA’s successful AluFix hand-set formwork system. Its wide-ranging applications, with crane-free deployment for casting foundations, walls, even floor slabs, have now been further extended: 150 and 300 cm tall AluFix column panels...
New edition of FormworkPress is out
The latest issue of our customer magazine, FormworkPress IV-2024, is now available for downloading. Here you can read how astute contractors successfully master both the routine and out-of-the-ordinary challenges posed by their projects. You can learn about the particular...
Optimum water management
Over the past three years, MEVA has invested millions in Plant 2. The heart of the rental formwork business at the Haiterbach site had reached its technical and logistical limits. The modernization measures and modifications during ongoing operations have...
Focus on sustainability
“We are MEVA” is the title of the first Sustainability Report, which can be read online or downloaded from the company’s homepage www.meva.net. More and more often, customers, partner companies and interest groups require this type of sustainability report...
Dive into the latest issue of FormworkPress – available now!
The new FormworkPress October 2023 edition has arrived! Discover in our customer magazine how our partners tackle various challenges in the implementation of concrete construction projects. Learn how MEVA’s smart solutions and technical innovations simplify work on your construction...
Simply smart slab formwork
The requirements during slab construction are wide-ranging: in-situ concrete or prefabricated parts, small cellar ceilings up to surfaces with thousands of square metres, slab thicknesses, slab heights, challenging floor plans, compensations, architectural concrete requirements … all these factors mean...
The new Formwork Press March 2023 edition has arrived!
Read the latest edition of the Professional Formwork News Read in our customer magazine how our partners face challenges in the implementation of concrete construction projects. Find out how MEVA’s clever solutions and technical innovations simplify work on your...
Foldable all-in-one solution MIS
Safety on the construction site is not open to negotiation. The safety system MIS that MEVA will be presenting during bauma offers a new dimension of work safety. Safety system for wall formwork systems and rapid construction progress MIS...
Green electricity from sunlight
Generating renewable energy is a major factor in the Black Forest region in the south-west of Germany. MEVA is increasingly relying on photovoltaic (PV) systems as a clean way to produce electricity, as solar power can be produced directly...