Blog

MEVA blogs discussing industry topics and addressing the issues facing the formwork and falsework industry, as well as providing tips and advice on working within the formwork construction industry.

Back to top

MEVA develops Pre-Assembly Team

Saving a customer’s time on the jobsite / Fuels growth over the past five years Since coming to the North American Market, MEVA has made it a primary objective to put the customer’s needs first. When the opportunity presented...

1,500 applications with only one facing

alkus facing in figures 1 alkus all-plastic facing can be used more than 1,000 times and sometimes even more than 1,500 times. 7 years: The long-term warranty on alkus provides end users with a high level of planning security....

The Shift to Modular Contruction

Modular construction is making a comeback. Although it has been tried with varying degrees of success in many countries over the years, it has never gained a solid foothold within the construction industry. For many, modular or prefabricated construction...

The difference between formwork and falsework

The pouring of concrete, like many construction processes, has its own set of jargon. An often-asked question about poured in-situ concrete is, what is the difference between formwork and falsework? However, in some regions – such as the USA...

Celebrating Our Female Engineers

Diversity and inclusion is one of MEVA’s core values and something we feel very strongly about. To celebrate our female engineers, we spoke to Rochelle Belaro and Sunshine Panem, both of whom are Junior Formwork Designers in MEVA UAE...

Reduce, reuse, repair, recycle: a sustainable approach for formwork

According to the Global Alliance for Buildings and Construction (GABC) – part of the United Nations Environment Programme – 38% of the global carbon dioxide (CO2) emissions in 2019 were attributed to the buildings and construction sector. Of these, 10% were a...

When Effort Pays Off

What do you do when you know that your processes can be more efficient, but a tool doesn’t exist for your area of work? For Sajid Mahmood, MEVA UK’s MAC Design Manager, the answer was to teach himself a...

What is the Most Sustainable Formwork?

As the construction industry strives to be more environmentally friendly, an increasing amount of importance is being placed on the sustainability of the materials that are used. In terms of formwork, the main choices are plywood (timber), plastic-faced formwork,...

The Benefits of BIM for Formwork

Digitalisation has been advancing rapidly within the construction industry as the technological landscape has changed. One of the major changes has been the adoption of Building Information Modelling (BIM). BIM can help construction companies control costs, collaborate, and construct...

How to Install Formwork Without a Crane

Busy construction hotspots can often be identified from the number of cranes that dot the horizon. For many projects – particularly large or high-rise buildings – a crane seems a necessity. However, there are many situations where a crane...

The Oldest Concrete Structures That Have Lasted

Concrete is a common building material that is used prolifically in the construction of many buildings and infrastructure projects. The strength, durability, and flexibility of this material has added to its popularity. Yet concrete has actually been around since...

Close search and go back to site