Fantastic experience in Canada

For the construction of a fertiliser storage facility in Ontario, the Canadian company Cornerstone Ltd. used the systems MEVA32 (shoring tower) and Imperial (wall formwork), which have been very successful on the North American market, combined with the MEP shoring tower system.

The lightweight MEVA32 aluminium frames have a load-bearing capacity of 142 kN (32 kip) and can be quickly assembled with a minimum of effort and just a few parts. During this project, elements of MEVA32 and MEP were combined and used as formwork tables that were easily relocated by crane to the next place of use after every pouring cycle. 6.7 m high walls were poured using the high-performance Imperial wall formwork. Here, efficiency was also the trump card, as several panels were joined to form large forming areas and relocated by crane, thus significantly reducing the time and effort required.

The systems were easy to assembly, everything fitted together well and the resulting walls had a good surface quality. A fantastic experience. We are looking forward to the next project with MEVA.

Site manager Chris Lambert

Close search and go back to site