Our Projects
In the Philippines and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.
Select your region:
An architectural masterpiece
Substantial expansion of of The Vienna University of Economics and Business meant a requirement to extend the campus, with a further six buildings planned – four of which were erected using MEVA formwork and formwork solutions.
Extraordinary stadium design
MEVA worked with the contractor to design a cantilevered shoring system at FC Felcsút’s Stadium in Hungary that would allow the roof supports to be cast without damaging the playing field.
Accelerated commercial building
The contractor chose the MonoDec slab formwork system to accelerate their construction schedule on this commercial building in Bolivia.
Quick, light & easy
On its first project within India, MEVA’s MonoDec slab formwork system exceeded the contractor’s expectations.
Clear run to Versoud
A new bridge constructed over a railway line minimised track disruption with the Mammut 350 formwork and SecuritBasic safety system.
A successful debut
The strategic joint venture of Novatec-MEVA-Pilbara (NMP) has helped to build several key formwork infrastructure assets for Western Australia’s mining industry.
Mammut XT saves time
Thanks to the efficiency of the Mammut XT system, a new housing complex was built faster than the contractor anticipated.
Ecological, practical, good
A retaining wall with integrated columns was able to be installed without a crane and despite challenging site conditions by making use of MEVA’s AluFix wall formwork system.
Exceptional bridge piers
A new interchange and bridge was constructed as part of a motorway upgrade and bespoke formwork is needed to create the bridge piers.
Complex vertical louvre wall
A bespoke 3D modelled formwork design provides the solution to a complex vertical louvre geometry at the Airport end of Stuttgart’s new rail extension.
Simple. Smart. Safe
A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA’s wall and slab formwork systems.