Our Projects

In the Philippines and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.

Back to top

India’s green hotel

The 320m-tall, Palais Royale in Mumbai was India’s first green building, achieving LEED Platinum certification. MEVA’s automated climbing system (MAC) was used to ensure the project was delivered safely, efficiently and on time.

Flexible tower construction

The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.

Fair-faced climbing

With its unique anchoring system, the MEVA MAC formwork climbing system was able to achieve a superior surface finish in the construction of Ardmore Park, Singapore.

MAC: quick & flexible

A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.

High above Manchester

Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.

The Museum of the Future

The giant, oval Museum of the Future in Dubai contains seven floors, on top of a three-storey podium, with each storey varying in height. The key to success was careful planning, innovative Building Information Modelling of the 3D design and a combination of adaptable formwork solutions, to create the curved structure of this futuristic Museum.

Highest building ever

MEVA rose to the challenge to help construct the Burj Khalifa – the tallest building in the world. Pouring 154 floors over the 829m height whilst remaining on schedule required formwork solutions that were durable and efficient.

An architectural masterpiece

Substantial expansion of of The Vienna University of Economics and Business meant a requirement to extend the campus, with a further six buildings planned – four of which were erected using MEVA formwork and formwork solutions. 

Special formwork construction using slab, wall and shoring systems at Pancho Stadium Hungary

Extraordinary stadium design

MEVA worked with the contractor to design a cantilevered shoring system at FC Felcsút’s Stadium in Hungary that would allow the roof supports to be cast without damaging the playing field.

Attura-Office-Building-MonoDec-Aluminium-Slab-Formwork-Bolivia-MEVA-16894

Accelerated commercial building

The contractor chose the MonoDec slab formwork system to accelerate their construction schedule on this commercial building in Bolivia.

White-Alpha-Office-Buildings-Slab-Formwork-MonoDec-India-MEVA

Quick, light & easy

On its first project within India, MEVA’s MonoDec slab formwork system exceeded the contractor’s expectations.

Factory building becomes living space

MevaDec facilitates the renovation of an old building in Steyr

Load More
Close search and go back to site