Select your region:
Climbing Formwork
MAC
Automatic climbing at great heights
Proven track record in across the world
Safety and speedy construction are the priorities when erecting very tall buildings. MEVA offers ideal solutions ranging from classic climbing scaffolds to automatic climbing systems for all high-rise construction projects ensuring efficient and quick climbing, even under challenging conditions.
The MEVA automatic climbing (MAC) system climbs hydraulically as a single unit, simplifying the construction process and increasing safety, compared with climbing systems in which every platform climbs individually. It’s also crane independent, saving time and money.
MAC’s proven track record includes the two highest office buildings in Switzerland, the Roche Tower buildings 1 and 2; the tallest building on the Indian subcontinent, the Palais Royale in Mumbai; and the One World Hotel in Singapore.
The completely covered and enclosed unit provides comfortable working conditions as well as protection against the weather. The platform provides a comfortable working area and sufficient storage spaces as well as allowing concrete placing booms to be integrated. Work on wall and slab can be performed independently, increasing productivity and ensuring rapid construction.
MAC’s clever design enables the formwork to be adapted quickly and easily to the building’s geometry. In addition, entire gangs can be moved in a single operation, saving time whenever the formwork is set up or stripped. The complete unit can be raised by 4.5m in just 60 minutes and can be performed by small teams.
MAC can be pre-assembled upon request for rapid and efficient assembly on site. It can be used with all MEVA wall formwork systems.
Got a specific enquiry about MAC?
Why not call our team on +632 917 7370
Safe and efficient, climbing automatically without the need for a crane.
Crane independent
- Fast and efficient, especially at great heights.
- Frees up crane for other tasks.
Climbing process
- Tried-and-tested technology.
- Improved efficiency.
- Shorter construction time.
Safe access
- Integrated platforms and ladders.
High-performance hydraulic system
- Climbs as a single unit, saving time and money.
Flexibly adaptable
- Modular system.
Minimal timings
- Just one day needed for stripping, climbing and setting up the formwork. Depending on the duration of the boxout work, four days per cycle have already been achieved on numerous occasions.
Completely covered and closed working platform
- Comfortable working conditions.
- Protected from the elements.
- Screening blocks outside view and also provides privacy.
- Construction schedule independent of weather.
- Enables work to be performed independently on wall and slab.
MAC Automated climbing systems are designed and engineered around your specific needs.
Our team of designers and engineers will work with our clients to ensure that every aspect of the detailed process delivers the perfect climbing solution for your needs.
For more detailed technical information please refer to the download tab which contains PDF information about this product.
High performance
Hydraulic system of the MAC automatic climbing system allows a stroke of 4.5 metres (20t per cylinder).
Reduced material costs
The bearing pockets are removed from the trailing platform and reused during the next climbing stage. This reduces the material costs, as no lost build-in parts are left over in the concrete.
MEVA provides a wide range of downloads. Here you will find product information, instruction manuals and much more.
For some downloads we may ask you for your email address so we can send your download to your chosen email address. For your convenience these downloads relate directly to this product. You can also find a full range of pdf downloads here..
Related products and accessories
All MEVA systems are designed to be compatible, saving you time and money. We think you might find these products useful.
Meva FormSet
MEVA’s system-independent accessories include smart solutions like quick anchors, stop-end systems and security systems as well as reusable box-out corners to make your next construction project as easy as possible.
MGC-H
MGC-H Climbing System elevates utilizing hydraulics and cranes after the completion of each level, and provides sufficient space for forming and box workouts with slide carriages.
MGS-H
The MGS-H rail-guided screen system provides all-round enclosure of the slab edges in the upper storeys. The system climbs both hydraulically or by crane.
KAB
Working and safety scaffold with integrated platform flooring and fold-out guarding rail. KAB foldable working platform can also serve as a climbing scaffold.
Our Projects
Examples of projects in your region and around the world
Let our team help you select the right product.
Talk to one of our MEVA formwork specialists, we can help you with all your formwork needs from the ground up. Let us help with your next formwork project.
Subscribe to the MEVA newsletter
MEVA news, worldwide projects and tips & tricks from formwork professionals, digitally and directly to your inbox.