Our Projects
In Australia, New Zealand and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.
Select your region:
MAC: quick & flexible
A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.
Mammut XT saves time
Thanks to the efficiency of the Mammut XT system, a new housing complex was built faster than the contractor anticipated.
A successful debut
The strategic joint venture of Novatec-MEVA-Pilbara (NMP) has helped to build several key formwork infrastructure assets for Western Australia’s mining industry.
A solid foundation
The need for a highly robust formwork system to handle the sheer volume of concrete for this project was met by MEVA’s Mammut products.
Climbing safely & flexibly
The MAC climbing formwork system was able to cast the curved building cores of the Ayala Triangle Gardens Diamond development in Manilla, despite the complex geometry, challenging weather conditions, and a demanding pour schedule.
The world’s biggest water reservoir
Water reservoirs with a total capacity of 17 million cubic metres are built in the Qatari desert with MEVA formwork systems.