Project Case Studies
Our projects from around the UK.
Select your region:
Simple. Smart. Safe
A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA's wall and slab formwork systems.
High above Manchester
Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.
The world’s biggest water reservoir
Water reservoirs with a total capacity of 17 million cubic metres are built in the Qatari desert with MEVA formwork systems.
Architectural concrete masterpiece
The cuboid-shaped extension of Zurich Art Museum is a shining example of the potential of fair-faced concrete using MEVA's formwork systems, despite the architectural and structural engineering challenges.
Flexible tower construction
The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.
Extraordinary stadium design
MEVA worked with the contractor to design a cantilevered shoring system at FC Felcsút's Stadium in Hungary that would allow the roof supports to be cast without damaging the playing field.
The museum of the future
The giant, oval Museum of the Future in Dubai contains seven floors, on top of a three-storey podium, with each storey varying in height. The key to success was careful planning, innovative Building Information Modelling of the 3D design...
An architectural masterpiece
Substantial expansion of of The Vienna University of Economics and Business meant a requirement to extend the campus, with a further six buildings planned – four of which were erected using MEVA formwork and formwork solutions.