Project Case Studies

Our projects from around the UK.

Back to top
Projects-Archive-Roche-Completed-Project

178-m Skyscraper – Roche tower in Basel

Using MAC automatic hydraulic climbing systems in tandem with MGS guiding screen for efficiency, each level of the building will take just 8 days to erect, all while the MEVA systems provide a safe working environment for on site...

Projects-Archive-Canal-Feature-Foundations

Europe’s largest canal building project near Vienna, Austria

A special task force was formed at nearby MEVA Austria headquarters to master the complex concrete works and formwork challenges of the largest canal building project in Europe.

Projects-Archive-Karlsruhe-Feature-MT-60

Metro Karlsruhe: STB 450 support frame masters forces of 250 kN

As cars are banned from the streets of central Karlsruhe, and trams are to be relocated below ground, MEVA formwork is being used to pour the outer and intermediate walls of a new train station along the city's first...

Projects-Archive-Testbed-Chamber

Testbed for jet engines airbus A 380

High temperatures and tall wall heights prove small obstacles, tackled by concrete retardation and Mammut 350's high pressure tolerance.

Construction of Bridge Versoud France_MEVA formwork products

Clear run to Versoud

A new bridge constructed over a railway line minimised track disruption with the Mammut 350 formwork and SecuritBasic safety system.

Projects-Archive-Bridge-View-Feature

Bridge building: New technology saves time

A new steel composite bridge has been constructed on the northern side of this stone arch bridge, which dates back to the 1930s. The abutments and pier foundations were poured using MEVA’s Mammut wall formwork, in addition to Space shoring...

Projects-Archive-Linthal-STB-Supports

Europe’s large hydro power plant: Linthal 2015

Hydro power plant with retaining structures and pumping station. Heavy duty formwork in the form of Mammut 350 and Circo were both employed to deliver on a monumental scale.

Projects-Archived-Ireland-Concrete-Columns

Ireland’s largest water treatment plant

Creating the largest water treatment plant in Ireland. Mammut, Carofalt and Triplex formed the perfect solution, with a fair faced finish thanks to alkus panels.

London-Prestigious-Birds-Eye-View

Prestigious development in London City

The Battersea development project in London relies on MEVA formwork technology to deliver the superior concrete finish required by the architects.

MEVA special formwork design is used to create the vertical louvre walls

Complex vertical louvre wall

A bespoke 3D modelled formwork design provides the solution to a complex vertical louvre geometry at the Airport end of Stuttgart’s new rail extension.

MEVA's bespoke formwork is used to build concrete bridge piers

Exceptional bridge piers

A new interchange and bridge was constructed as part of a motorway upgrade and bespoke formwork is needed to create the bridge piers.

Construction of Shopping Centre, Bucaramanga, Columbia using MEVA AluFix wall formwork

Ecological, practical, good

A retaining wall with integrated columns was able to be installed without a crane and despite challenging site conditions by making use of MEVA's AluFix wall formwork system.