Project Case Studies
Our projects from around the UK.
Select your region:
178-m Skyscraper – Roche tower in Basel
Using MAC automatic hydraulic climbing systems in tandem with MGS guiding screen for efficiency, each level of the building will take just 8 days to erect, all while the MEVA systems provide a safe working environment for on site...
Europe’s largest canal building project near Vienna, Austria
A special task force was formed at nearby MEVA Austria headquarters to master the complex concrete works and formwork challenges of the largest canal building project in Europe.
Metro Karlsruhe: STB 450 support frame masters forces of 250 kN
As cars are banned from the streets of central Karlsruhe, and trams are to be relocated below ground, MEVA formwork is being used to pour the outer and intermediate walls of a new train station along the city's first...
Testbed for jet engines airbus A 380
High temperatures and tall wall heights prove small obstacles, tackled by concrete retardation and Mammut 350's high pressure tolerance.
Clear run to Versoud
A new bridge constructed over a railway line minimised track disruption with the Mammut 350 formwork and SecuritBasic safety system.
Bridge building: New technology saves time
A new steel composite bridge has been constructed on the northern side of this stone arch bridge, which dates back to the 1930s. The abutments and pier foundations were poured using MEVA’s Mammut wall formwork, in addition to Space shoring...
Europe’s large hydro power plant: Linthal 2015
Hydro power plant with retaining structures and pumping station. Heavy duty formwork in the form of Mammut 350 and Circo were both employed to deliver on a monumental scale.
Ireland’s largest water treatment plant
Creating the largest water treatment plant in Ireland. Mammut, Carofalt and Triplex formed the perfect solution, with a fair faced finish thanks to alkus panels.
Prestigious development in London City
The Battersea development project in London relies on MEVA formwork technology to deliver the superior concrete finish required by the architects.
Complex vertical louvre wall
A bespoke 3D modelled formwork design provides the solution to a complex vertical louvre geometry at the Airport end of Stuttgart’s new rail extension.
Exceptional bridge piers
A new interchange and bridge was constructed as part of a motorway upgrade and bespoke formwork is needed to create the bridge piers.
Ecological, practical, good
A retaining wall with integrated columns was able to be installed without a crane and despite challenging site conditions by making use of MEVA's AluFix wall formwork system.