Project Case Studies

Our projects from around the UK.

Back to top
MT60 shoring in use for the construction of Mercedes building

Flying high with MT 60

MEVA's MT 60 Shoring tower system plays a vital role in supporting the new commercial building for Germany's oldest car manufacturer, and Mercedes-Benz partner, S&G Automobil AG.

The upper level of the Kudamm boulevard in construction

New splendour on the Ku‘damm

A wide variety of MEVA formwork and safety solutions sees two basement levels (the equipment level and the retail level), the ground floor and five upper floors as well as a set-back equipment floor of new "Gloria Berlin" completed...

Slab formwork shoring mechanism on Cathedral construction

Entrance gate to the cathedral city

Several MEVA formwork and support systems are utilized to erect the new the Sedelhöfe complex. With a total investment volume of € 350 million, a striking project has been undertaken on the spot where Albert Einstein himself was born.

Projects-Archive-Centrifuge-Working-Platforms

All-round precision

MEVA's Radius circular wall formwork system produces a perfectly round concrete centrifuge at the Deltares Institute for applied research in the field of water and subsurface movements

Projects-Archive-Winx-Construction-View

WINX Tower: One floor higher per week

MEVA's MGS and MGC climbing systems raise a level per week of construction of the Winx tower in Stuttgart, Germany.

Projects-Archive-Digital-Tablet-On-Site

New dimensions in formwork design

MEVA adapts it's methods of planning and co-ordination after the digital revolution has triggered the development of building information modelling (BIM). Find out how MEVA is staying ahead of the curve.

Projects-Archive-Liantang-Construction-Site

Liantang tunnel project with single-sided climbing solution for gravity walls

MGC Climbing formwork and Mammut 350 Wall formwork tackle administrative buildings and ventilation facilities in Hong Kong's largest motorway tunnel project.

Ayala-Triangle-Gardens-Climbing-Formwork-Manila-Philippines-MEVA

Climbing safely & flexibly

The MAC climbing formwork system was able to cast the curved building cores of the Ayala Triangle Gardens Diamond development in Manilla, despite the complex geometry, challenging weather conditions, and a demanding pour schedule.

Copper-Mine-Formwork-Wall-Antofagasta-Chile-MEVA

A solid foundation

The need for a highly robust formwork system to handle the sheer volume of concrete for this project was met by MEVA’s Mammut products.

Projects-Archive-College-Front-View

Reconstruction of the College of Education in Lower Austria

Three new buildings will be erected following the restoration and renovation of Lower Austria's College of Education, the largest of which is the new high school building with four levels, the second a two-level school practice facility and the...

Projects-Arachive-Stuttgardt-Feature-Working-Platforms

New 11.50 m high Hall 10 for Stuttgart Trade Fair Centre with Top Finish

MEVA shoring systems support 630 m² of in-situ concrete ceilings with thicknesses from 25 to 50 cm, at heights up to 9.30 m inside Hall 10, while SecuritBasic provides brilliant on-site safety conditions.

Projects-Archive-Bucharest-Feature-Columns

National Stadium Lia Manoliu in Bucharest

The 55,000 seater stadium is a 6 level, 108,000 m² complex, 120 columns of which stands 27.5 m high and was built using MEVA´s shoring tower SPACE and the 100 kN/m² Mammut 350 wall formwork system.

Close search and go back to site