Project Case Studies
Our projects from around the UK.
Select your region:
Flying high with MT 60
MEVA's MT 60 Shoring tower system plays a vital role in supporting the new commercial building for Germany's oldest car manufacturer, and Mercedes-Benz partner, S&G Automobil AG.
New splendour on the Ku‘damm
A wide variety of MEVA formwork and safety solutions sees two basement levels (the equipment level and the retail level), the ground floor and five upper floors as well as a set-back equipment floor of new "Gloria Berlin" completed...
Entrance gate to the cathedral city
Several MEVA formwork and support systems are utilized to erect the new the Sedelhöfe complex. With a total investment volume of € 350 million, a striking project has been undertaken on the spot where Albert Einstein himself was born.
All-round precision
MEVA's Radius circular wall formwork system produces a perfectly round concrete centrifuge at the Deltares Institute for applied research in the field of water and subsurface movements
WINX Tower: One floor higher per week
MEVA's MGS and MGC climbing systems raise a level per week of construction of the Winx tower in Stuttgart, Germany.
New dimensions in formwork design
MEVA adapts it's methods of planning and co-ordination after the digital revolution has triggered the development of building information modelling (BIM). Find out how MEVA is staying ahead of the curve.
Liantang tunnel project with single-sided climbing solution for gravity walls
MGC Climbing formwork and Mammut 350 Wall formwork tackle administrative buildings and ventilation facilities in Hong Kong's largest motorway tunnel project.
Climbing safely & flexibly
The MAC climbing formwork system was able to cast the curved building cores of the Ayala Triangle Gardens Diamond development in Manilla, despite the complex geometry, challenging weather conditions, and a demanding pour schedule.
A solid foundation
The need for a highly robust formwork system to handle the sheer volume of concrete for this project was met by MEVA’s Mammut products.
Reconstruction of the College of Education in Lower Austria
Three new buildings will be erected following the restoration and renovation of Lower Austria's College of Education, the largest of which is the new high school building with four levels, the second a two-level school practice facility and the...
New 11.50 m high Hall 10 for Stuttgart Trade Fair Centre with Top Finish
MEVA shoring systems support 630 m² of in-situ concrete ceilings with thicknesses from 25 to 50 cm, at heights up to 9.30 m inside Hall 10, while SecuritBasic provides brilliant on-site safety conditions.
National Stadium Lia Manoliu in Bucharest
The 55,000 seater stadium is a 6 level, 108,000 m² complex, 120 columns of which stands 27.5 m high and was built using MEVA´s shoring tower SPACE and the 100 kN/m² Mammut 350 wall formwork system.