Our Projects

Across the Middle East and beyond, our highly professional project teams work together to ensure the rapid, effective on-site deployment of expert personnel to tackle any task.

Back to top

A solid foundation

The need for a highly robust formwork system to handle the sheer volume of concrete for this project was met by MEVA’s Mammut products.

Architectural concrete masterpiece

The cuboid-shaped extension of Zurich Art Museum is a shining example of the potential of fair-faced concrete using MEVA’s formwork systems, despite the architectural and structural engineering challenges.

Fair-faced climbing

With its unique anchoring system, the MEVA MAC formwork climbing system was able to achieve a superior surface finish in the construction of Ardmore Park, Singapore.

India’s green hotel

The 320m-tall, Palais Royale in Mumbai was India’s first green building, achieving LEED Platinum certification. MEVA’s automated climbing system (MAC) was used to ensure the project was delivered safely, efficiently and on time.

MAC: quick & flexible

A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.

Factory building becomes living space

MevaDec facilitates the renovation of an old building in Steyr

Wallformwork on a residential development

Mammut XT saves time

Thanks to the efficiency of the Mammut XT system, a new housing complex was built faster than the contractor anticipated.

Simple. Smart. Safe

A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA’s wall and slab formwork systems.

High above Manchester

Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.

Heavy duty formwork props on display on bridge construction

Clear run to Versoud

A new bridge constructed over a railway line minimised track disruption with the Mammut 350 formwork and SecuritBasic safety system.

Complex vertical louvre wall

A bespoke 3D modelled formwork design provides the solution to a complex vertical louvre geometry at the Airport end of Stuttgart’s new rail extension.

Flexible tower construction

The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.

Load More
Close search and go back to site