Project Case Studies
Our projects from around the UK.
Select your region:
Complex vertical louvre wall
A bespoke 3D modelled formwork design provides the solution to a complex vertical louvre geometry at the Airport end of Stuttgart’s new rail extension.
Ecological, practical, good
A retaining wall with integrated columns was able to be installed without a crane and despite challenging site conditions by making use of MEVA's AluFix wall formwork system.
Simple. Smart. Safe
A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA's wall and slab formwork systems.
The world’s biggest water reservoir
Water reservoirs with a total capacity of 17 million cubic metres are built in the Qatari desert with MEVA formwork systems.
An architectural masterpiece
Substantial expansion of of The Vienna University of Economics and Business meant a requirement to extend the campus, with a further six buildings planned – four of which were erected using MEVA formwork and formwork solutions.