Faster, safer, more efficient
Contractor: LinkENERGIE Industries Company Incorporated
The Binangonan Pumping Station and Reservoir project in Rizal, Philippines, is on a fast track to completion thanks to the use of MEVA’s AluFix system.
Pumping station and reservoir built with MEVA’s AluFix
The Binangonan Pumping Station and Reservoir project in Rizal, Philippines, is on a fast track to completion thanks to the use of MEVA’s AluFix system.
The project is managed by the highly reputable end-to-end construction and design services company LinkENERGIE Industries Co. Inc. The scope includes constructing a 667 m² reservoir and water supply facility for Manila Water to be responsible for supplying water to Metro Manila from the regions of Laguna and Rizal. The site spans 30 m in length and 22.2 m in width, with the work having begun in February 2023.
In the past, utilising a different method led to uneven surfaces and numerous finishing corrections. However, with MEVA’s AluFix system, the construction process was significantly smoother, requiring minimal adjustments and ensuring uniformity in the finished structures.
Less time required
Time was a critical factor in the project’s success, and AluFix proved to be the perfect solution. Its efficient setup allowed for quicker completion, and its adaptability facilitated easy adjustments to unforeseen changes. AluFix eliminated the need for most additional components like shoring and connections for phenolic and aluminum supports, thus simplifying the construction process. The system’s versatility also made it more manageable when working with irregular shapes and thus reducing the reliance on phenolic formwork.
Streamlining the timeline
In terms of time efficiency, AluFix outperformed conventional methods by completing the formwork in less than four days, compared to the projected week with traditional phenolic formwork and shoring. This is also partly due to the possibility of ganglifting and shifting AluxFix to the next site, thus eliminating the need for disassembly and reassembly. Disassembling the AluFix formwork is equally seamless, requiring the simple removal of clamps and tie rods. The efficiency of this process minimises downtime and streamlines the construction timeline.
Superior strength provides safety
Safety was paramount throughout the construction process and AluFix’s stability under pressure from strong water flow and vibrations was commendable. The formwork remained firm and reliable, even during intense work conditions. Compared to traditional methods, AluFix offers superior strength and ensures a smooth pouring process without the risk of formwork failure.
Successful execution
The success of the Binangonan Pumping Station and Reservoir project is a testament to the effectiveness of MEVA’s AluFix system. MEVA Philippines is proud to have collaborated with LinkENERGIE as companies committed to excellence. The project’s successful execution has elevated the construction standards and set a benchmark for future endeavours in the region.

MEVA systems:
Contractor:
LinkENERGIE Industries Company Incorporated
Principal:
Manila Water Company, Inc.
Project:
Binangonan Pumping Station and Reservoir, Rizal, Philippines
Engineering and support:
MEVA Philippines, Inc.
Got any questions about this topic?
Why not get in touch, we are here to help you.
If you want to know more about this or any other projects please use the contact form to get in touch, we would love to hear from you.
For contact details specific to this region, visit the contact us page to find out more.