News

Stay up to date with news, blogs and updates from MEVA in your region and around the world.

Back to top

Cost-effective hand-set solution

With three monolithic formwork systems, MEVA supports the economical and fast construction of residential and commercial buildings. MonoFix, MonoDec and MonoWall bring great efficiency to construction sites, as they are easy to use and can be adapted to any...

New: AluFix Column Panels

User-friendliness and flexibility are the hallmarks of MEVA’s successful AluFix hand-set formwork system. Its wide-ranging applications, with crane-free deployment for casting foundations, walls, even floor slabs, have now been further extended: 150 and 300 cm tall AluFix column panels...

New edition of FormworkPress is out

The latest issue of our customer magazine, FormworkPress IV-2024, is now available for downloading. Here you can read how astute contractors successfully master both the routine and out-of-the-ordinary challenges posed by their projects. You can learn about the particular...

Optimum water management

Over the past three years, MEVA has invested millions in Plant 2. The heart of the rental formwork business at the Haiterbach site had reached its technical and logistical limits. The modernization measures and modifications during ongoing operations have...

MEVA in São Paulo and Nairobi

In cooperation with our local partner Europa Infrastructure Technologies, MEVA took part in the Buildexpo Kenya at the exhibition grounds in the capital Nairobi for the first time. The economic and user-friendly products MevaFlex, MonoDec and MonoFix, in particular,...

Focus on sustainability

“We are MEVA” is the title of the first Sustainability Report, which can be read online or downloaded from the company’s homepage www.meva.net. More and more often, customers, partner companies and interest groups require this type of sustainability report...

Efficient building construction

EcoFix hand-set formwork for fast construction progress The new MEVA EcoFix formwork system has quickly established itself in many regions worldwide (see pages 6 and 14). One of the secrets of its success is its flexibility, which makes efficient...

SchalungsDruck German Customer magazine from MEVA

Dive into the latest issue of FormworkPress – available now!

The new FormworkPress October 2023 edition has arrived! Discover in our customer magazine how our partners tackle various challenges in the implementation of concrete construction projects. Learn how MEVA’s smart solutions and technical innovations simplify work on your construction...

“MonoFix has helped us a lot”

Ric Pierre Torno, an engineer with Rotaflex Construction & Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team‘s experience with MonoFix and the MEVA service. Interview with project manager...

Simply smart slab formwork

The requirements during slab construction are wide-ranging: in-situ concrete or prefabricated parts, small cellar ceilings up to surfaces with thousands of square metres, slab thicknesses, slab heights, challenging floor plans, compensations, architectural concrete requirements … all these factors mean...

Time saved with very little material

There is often an acute shortage of space on construction sites in the middle of large cities. Optimum logistics and low material requirements are thus prerequisites for the successful realisation of projects. During construction of the Handelskai 214A residential...

EcoFix arouses interest

A few months ago at the bauma trade fair in Munich, MEVA presented a particularly efficient and flexible formwork system tailored to the requirements of markets in Asia, Africa, Latin America and Central America: EcoFix is a crane-independent hand-set...

Close search and go back to site