Project Case Studies
Our projects from around the UK.
Select your region:
Groundbreaking research plant
Pioneering research into the field of antimatter required a large yet safe enclosure in a remote area of northern Minnesota, which was built 12 meters below grade in granite rock, with composite precast and in-situ construction.
New splendour on the Ku‘damm
A wide variety of MEVA formwork and safety solutions sees two basement levels (the equipment level and the retail level), the ground floor and five upper floors as well as a set-back equipment floor of new "Gloria Berlin" completed...
Complex dam renovation using MEVA formwork
MEVA's STB support system and KLK climbing system renovate the Klingenberg Dam, which is under monumental protection, after flooding damage in 2002.
All-round satisfaction
Mave's Radius circular formwork system, and STB 450 support system provide the foundations for an intriguing alternative energy source in Cagnes-sur-Mer.
New dimensions in formwork design
MEVA adapts it's methods of planning and co-ordination after the digital revolution has triggered the development of building information modelling (BIM). Find out how MEVA is staying ahead of the curve.
Europe’s largest canal building project near Vienna, Austria
A special task force was formed at nearby MEVA Austria headquarters to master the complex concrete works and formwork challenges of the largest canal building project in Europe.
Metro Karlsruhe: STB 450 support frame masters forces of 250 kN
As cars are banned from the streets of central Karlsruhe, and trams are to be relocated below ground, MEVA formwork is being used to pour the outer and intermediate walls of a new train station along the city's first...
Europe’s large hydro power plant: Linthal 2015
Hydro power plant with retaining structures and pumping station. Heavy duty formwork in the form of Mammut 350 and Circo were both employed to deliver on a monumental scale.
Complex vertical louvre wall
A bespoke 3D modelled formwork design provides the solution to a complex vertical louvre geometry at the Airport end of Stuttgart’s new rail extension.
Ecological, practical, good
A retaining wall with integrated columns was able to be installed without a crane and despite challenging site conditions by making use of MEVA's AluFix wall formwork system.
Simple. Smart. Safe
A smart solution to create two new rescue tunnels in one of Germany’s oldest and most critical road tunnels, using MEVA's wall and slab formwork systems.
Flexible tower construction
The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.