Project Case Studies
Our projects from around the UK.
Select your region:
Climbing safely & flexibly
The MAC climbing formwork system was able to cast the curved building cores of the Ayala Triangle Gardens Diamond development in Manilla, despite the complex geometry, challenging weather conditions, and a demanding pour schedule.
178-m Skyscraper – Roche tower in Basel
Using MAC automatic hydraulic climbing systems in tandem with MGS guiding screen for efficiency, each level of the building will take just 8 days to erect, all while the MEVA systems provide a safe working environment for on site...
High above Manchester
Working in tandem, two MEVA Automated Climbing (MAC) systems built one storey every five days on these four residential towers in Manchester.
India’s green hotel
The 320m-tall, Palais Royale in Mumbai was India’s first green building, achieving LEED Platinum certification. MEVA's automated climbing system (MAC) was used to ensure the project was delivered safely, efficiently and on time.
MAC: quick & flexible
A new hotel in downtown Perth needed an adaptable formwork solution which could deliver the construction on time and in a busy urban location.
Flexible tower construction
The graduated taper of the Roche 2 tower in Switzerland meant that the complex formwork operations required thorough preparation to ensure the work was safe and could be delivered efficiently.
Fair-faced climbing
With its unique anchoring system, the MEVA MAC formwork climbing system was able to achieve a superior surface finish in the construction of Ardmore Park, Singapore.