{"id":9009,"date":"2023-06-21T14:35:41","date_gmt":"2023-06-21T13:35:41","guid":{"rendered":"https:\/\/meva.net\/en-me\/?p=9009"},"modified":"2023-08-31T07:10:50","modified_gmt":"2023-08-31T06:10:50","slug":"interview-with-project-manager","status":"publish","type":"post","link":"https:\/\/meva.net\/en-me\/interview-with-project-manager\/","title":{"rendered":"\u201cMonoFix has helped us a lot\u201d"},"content":{"rendered":"<p class=\"lead\">Ric Pierre Torno, an engineer with Rotaflex Construction &amp; Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> and the MEVA service.<\/p>\n<h3><span style=\"color: #e8221b\"><strong>Interview with project manager<\/strong><\/span><\/h3>\n<h5>Ric Pierre Torno, Rotaflex Construction &amp; Development Corp.<\/p>\n<\/h5>\n<p><em><strong><span style=\"color: #e8221b\">Why did you choose <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> for your project?<br \/>\n<\/span><\/strong><\/em>&#8220;We found that this monolithic system could be used continuously, simplifying our work and, above all, reducing the construction time. Initially, we had worked conventionally and lost a lot of time. But with <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a>, we construct the formwork for the entire building structure with walls, stairs and slabs and then pour the concrete completely. In this way, we were able to shorten the time for the shell of a building by at least two to three weeks.&#8221;<\/p>\n<p><em><strong><span style=\"color: #e8221b\">How long did it take with conventional construction method?<br \/>\n<\/span><\/strong><\/em>&#8220;It took us a long period of time \u2013 almost two months.&#8221;<\/p>\n<p><strong><em><span style=\"color: #e8221b\">What were the challenges on this construction site?<br \/>\n<\/span><\/em><\/strong>&#8220;The biggest problem was the location on an island. That made it difficult to procure materials. That\u2018s another reason why <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> helped us a lot, because it uses very little material and minimises the effort. We can use the formwork quickly and many times. Conventional material, on the other hand, would have to be considered in large quantities.&#8221;<\/p>\n<p><img loading=\"lazy\" class=\"alignnone  wp-image-9014 img-fluid lazyload \" src=\"https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-910x512.jpg\" alt=\"\" width=\"667\" height=\"375\" srcset=\"https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-910x512.jpg 910w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-1350x759.jpg 1350w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-510x287.jpg 510w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-1536x864.jpg 1536w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-2048x1152.jpg 2048w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-690x388.jpg 690w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-1110x624.jpg 1110w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-1600x900.jpg 1600w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-910x512@2x.jpg 1820w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17171-510x287@2x.jpg 1020w\" sizes=\"(max-width: 667px) 100vw, 667px\" \/><\/p>\n<p><strong><em><span style=\"color: #e8221b\">How long did it take for your employees to get used to the system?<br \/>\n<\/span><\/em><\/strong>&#8220;At the start, we had about six weeks for them to get familiarised with <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a>. Apart from minor details, it is easier to handle than conventional systems. This also means less training effort. With a little practice, we were able to finish a first floor in two weeks, including concreting.&#8221;<\/p>\n<p><strong><em><span style=\"color: #e8221b\">Did <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> improve your productivity and efficiency?<br \/>\n<\/span><\/em><\/strong>&#8220;Yes, <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> has really helped us a lot in making our work faster. With trained workers, we were able to complete 30 to 40 duplexes in just two months.&#8221;<\/p>\n<p><strong><em><span style=\"color: #e8221b\">Has the formwork fulfilled your expectations?<br \/>\n<\/span><\/em><\/strong>&#8220;The only difficulty at first was coping with the individual parts and not losing anything. But with the help of drawings and staff training, our staff became familiar with the system.&#8221;<\/p>\n<p><img loading=\"lazy\" class=\"alignnone  wp-image-9012 img-fluid lazyload \" src=\"https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-910x1239.jpg\" alt=\"\" width=\"466\" height=\"634\" srcset=\"https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-910x1239.jpg 910w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-1350x1839.jpg 1350w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-510x695.jpg 510w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-1128x1536.jpg 1128w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-1504x2048.jpg 1504w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-690x940.jpg 690w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-1110x1512.jpg 1110w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140-768x1046.jpg 768w, https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/17004-ret-scaled-e1687354960140.jpg 1536w\" sizes=\"(max-width: 466px) 100vw, 466px\" \/><\/p>\n<p><strong><em><span style=\"color: #e8221b\">How would you rate this system overall?<br \/>\n<\/span><\/em><\/strong>&#8220;I have never seen a system or product that is absolutely perfect. However, <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> is the best system I have used. Above all, it is easy to handle.&#8221;<\/p>\n<p><strong><em><span style=\"color: #e8221b\">What do you think about the MEVA services for training and delivery?<br \/>\n<\/span><\/em><\/strong>&#8220;The MEVA team has been the only one in my 22 years of professional experience that has done follow-up, follow-through on the training, and the visiting. Others who have been my partners only show up when collecting payment or there is a problem. Even when I didn\u2018t request anything, I received important and useful information and detailed reports. This is the first time I have experienced it this way.&#8221;<\/p>\n<p><strong><em><span style=\"color: #e8221b\">Would you recommend <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> to others?<br \/>\n<\/span><\/em><\/strong>&#8220;Yes, of course! <a href=\"https:\/\/meva.net\/en-me\/products\/monofix\/\">MonoFix<\/a> is really good and can help contractors significantly reduce their construction time.&#8221;<\/p>\n<p>Thank you for the interview, Mr. Torno.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Ric Pierre Torno, an engineer with Rotaflex Construction &amp; Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with MonoFix and the MEVA service. Interview with project manager Ric Pierre Torno, Rotaflex Construction &amp; Development Corp. Why did you choose MonoFix for your project? [&hellip;]<\/p>\n","protected":false},"author":18,"featured_media":9022,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[16],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.13 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>\u201cMonoFix has helped us a lot\u201d - MEVA Middle East (EN)<\/title>\n<meta name=\"description\" content=\"Ric Pierre Torno, an engineer with Rotaflex Construction &amp; Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with MonoFix and the MEVA service.\" \/>\n<meta name=\"robots\" content=\"index, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<link rel=\"canonical\" href=\"https:\/\/meva.net\/en-me\/interview-with-project-manager\/\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"\u201cMonoFix has helped us a lot\u201d - MEVA Middle East (EN)\" \/>\n<meta property=\"og:description\" content=\"Ric Pierre Torno, an engineer with Rotaflex Construction &amp; Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with MonoFix and the MEVA service.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meva.net\/en-me\/interview-with-project-manager\/\" \/>\n<meta property=\"og:site_name\" content=\"MEVA Middle East (EN)\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MEVAlive\/\" \/>\n<meta property=\"article:published_time\" content=\"2023-06-21T13:35:41+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2023-08-31T06:10:50+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/News-Torno-1920-500px.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"tiam\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"tiam\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"8 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meva.net\/en-me\/interview-with-project-manager\/\",\"url\":\"https:\/\/meva.net\/en-me\/interview-with-project-manager\/\",\"name\":\"\u201cMonoFix has helped us a lot\u201d - MEVA Middle East (EN)\",\"isPartOf\":{\"@id\":\"https:\/\/meva.net\/en-me\/#website\"},\"datePublished\":\"2023-06-21T13:35:41+00:00\",\"dateModified\":\"2023-08-31T06:10:50+00:00\",\"author\":{\"@id\":\"https:\/\/meva.net\/en-me\/#\/schema\/person\/acb4e3f3425c87c4f13255c5ef779131\"},\"description\":\"Ric Pierre Torno, an engineer with Rotaflex Construction & Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with MonoFix and the MEVA service.\",\"breadcrumb\":{\"@id\":\"https:\/\/meva.net\/en-me\/interview-with-project-manager\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meva.net\/en-me\/interview-with-project-manager\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meva.net\/en-me\/interview-with-project-manager\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meva.net\/en-me\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"\u201cMonoFix has helped us a lot\u201d\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meva.net\/en-me\/#website\",\"url\":\"https:\/\/meva.net\/en-me\/\",\"name\":\"MEVA Middle East (EN)\",\"description\":\"\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meva.net\/en-me\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/meva.net\/en-me\/#\/schema\/person\/acb4e3f3425c87c4f13255c5ef779131\",\"name\":\"tiam\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/meva.net\/en-me\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/52ea2434a18324550ea6768c1bfc58d7?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/52ea2434a18324550ea6768c1bfc58d7?s=96&d=mm&r=g\",\"caption\":\"tiam\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"\u201cMonoFix has helped us a lot\u201d - MEVA Middle East (EN)","description":"Ric Pierre Torno, an engineer with Rotaflex Construction & Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with MonoFix and the MEVA service.","robots":{"index":"index","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"canonical":"https:\/\/meva.net\/en-me\/interview-with-project-manager\/","og_locale":"en_GB","og_type":"article","og_title":"\u201cMonoFix has helped us a lot\u201d - MEVA Middle East (EN)","og_description":"Ric Pierre Torno, an engineer with Rotaflex Construction & Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with MonoFix and the MEVA service.","og_url":"https:\/\/meva.net\/en-me\/interview-with-project-manager\/","og_site_name":"MEVA Middle East (EN)","article_publisher":"https:\/\/www.facebook.com\/MEVAlive\/","article_published_time":"2023-06-21T13:35:41+00:00","article_modified_time":"2023-08-31T06:10:50+00:00","og_image":[{"width":1920,"height":500,"url":"https:\/\/meva.net\/en-me\/wp-content\/uploads\/sites\/21\/2023\/06\/News-Torno-1920-500px.jpg","type":"image\/jpeg"}],"author":"tiam","twitter_card":"summary_large_image","twitter_misc":{"Written by":"tiam","Estimated reading time":"8 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/meva.net\/en-me\/interview-with-project-manager\/","url":"https:\/\/meva.net\/en-me\/interview-with-project-manager\/","name":"\u201cMonoFix has helped us a lot\u201d - MEVA Middle East (EN)","isPartOf":{"@id":"https:\/\/meva.net\/en-me\/#website"},"datePublished":"2023-06-21T13:35:41+00:00","dateModified":"2023-08-31T06:10:50+00:00","author":{"@id":"https:\/\/meva.net\/en-me\/#\/schema\/person\/acb4e3f3425c87c4f13255c5ef779131"},"description":"Ric Pierre Torno, an engineer with Rotaflex Construction & Development Corp, is Maresca Home project manager in the Island Garden City of Samal. He shares his construction team\u2018s experience with MonoFix and the MEVA service.","breadcrumb":{"@id":"https:\/\/meva.net\/en-me\/interview-with-project-manager\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meva.net\/en-me\/interview-with-project-manager\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/meva.net\/en-me\/interview-with-project-manager\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meva.net\/en-me\/"},{"@type":"ListItem","position":2,"name":"\u201cMonoFix has helped us a lot\u201d"}]},{"@type":"WebSite","@id":"https:\/\/meva.net\/en-me\/#website","url":"https:\/\/meva.net\/en-me\/","name":"MEVA Middle East (EN)","description":"","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meva.net\/en-me\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/meva.net\/en-me\/#\/schema\/person\/acb4e3f3425c87c4f13255c5ef779131","name":"tiam","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/meva.net\/en-me\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/52ea2434a18324550ea6768c1bfc58d7?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/52ea2434a18324550ea6768c1bfc58d7?s=96&d=mm&r=g","caption":"tiam"}}]}},"_links":{"self":[{"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/posts\/9009"}],"collection":[{"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/users\/18"}],"replies":[{"embeddable":true,"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/comments?post=9009"}],"version-history":[{"count":14,"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/posts\/9009\/revisions"}],"predecessor-version":[{"id":9028,"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/posts\/9009\/revisions\/9028"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/media\/9022"}],"wp:attachment":[{"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/media?parent=9009"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/categories?post=9009"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meva.net\/en-me\/wp-json\/wp\/v2\/tags?post=9009"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}