{"id":8555,"date":"2022-05-12T11:13:56","date_gmt":"2022-05-12T10:13:56","guid":{"rendered":"https:\/\/meva.net\/en-cb\/?p=8555"},"modified":"2022-05-12T11:17:16","modified_gmt":"2022-05-12T10:17:16","slug":"investing-in-the-future","status":"publish","type":"post","link":"https:\/\/meva.net\/en-cb\/investing-in-the-future\/","title":{"rendered":"Investing in the future"},"content":{"rendered":"<p class=\"lead\">MEVA modernising with an eye on product quality and sustainability<\/p>\n<p>In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and sustainability. \u201cBoth factories had reached their limits of their technical and logistical capabilities,\u201d explains owner and managing director Florian F. Dingler. \u201cTo ensure high quality in the long term, we decided to make a major investment in modern technology and sustainable solutions.\u201d<\/p>\n<figure id=\"attachment_8668\" class=\"wp-caption figure alignnone\"><img loading=\"lazy\" class=\"img-fluid lazyload  wp-image-8668 size-medium\" src=\"https:\/\/meva.net\/en-gb\/wp-content\/uploads\/sites\/2\/2022\/05\/New-Cleaning-Facility-MEVA-Haiterbach-17469-910x682.jpg\" alt=\"\" width=\"910\" height=\"682\" \/><figcaption class=\"wp-caption-text figure-caption\">Holes and damage to the alkus formwork skin are manually inspected by experienced employees and professionally repaired.<\/figcaption><\/figure>\n<p><strong><br \/>\nRobots, lasers and photovoltaic systems<br \/>\n<\/strong>Since 2019, Production Plant I has been successively modernised through renewal of the electronic infrastructure, an assembly system for large-size panels, an H-table robot, a laser tube cutter and the introduction of a shop floor management system. Extensive investments in the building infrastructure and installation of a 950 kWp photovoltaic system round off the conversion work. In conjunction with a 300 kWh energy storage unit, in future we will be able to produce approximately 60% of the Haiterbach plant\u2019s energy requirements in an environmentally friendly way.<\/p>\n<figure id=\"attachment_8669\" class=\"wp-caption figure alignnone\"><img loading=\"lazy\" class=\"img-fluid lazyload  wp-image-8669 size-medium\" src=\"https:\/\/meva.net\/en-gb\/wp-content\/uploads\/sites\/2\/2022\/05\/New-Cleaning-Facility-MEVA-Haiterbach-17470-910x683.jpg\" alt=\"\" width=\"910\" height=\"683\" \/><figcaption class=\"wp-caption-text figure-caption\">The cleaned and repaired formwork elements are moved quickly and without effort using pneumatic lifting tools.<\/figcaption><\/figure>\n<p><strong><br \/>\nFully automatic cleaning<br \/>\n<\/strong>In Factory II, the formwork centre in Haiterbach, a fully automatic cleaning line is replacing the old system. MEVA is thus living up to its claim to be the sector\u2019s pioneer in the field of formwork cleaning as well. Intelligent system control enables optimum water and energy management for the lowest possible use of resources. A rotatory unit for regrinding facing surfaces and 20 m long roller conveyors for repairs also contribute to more rapid material turnover, flexible processing of customer orders and a high degree of material utilisation. The infrastructure has been upgraded by means of ergonomic workplaces, outdoor roofing, LED lighting and optimised truck logistics as well as a container terminal.<\/p>\n<blockquote>\n<p>We decided to modernise in Haiterbach for a good reason, as this is where our know-how is located, with superbly trained and experienced employees. MEVA is living up to its commitments to job security, competitiveness and environmental protection, and our customers can continue to place their trust in the quality and durability of our products.<\/p>\n<\/blockquote>\n<p><strong>Managing Partner Florian F. Dingler<\/strong><\/p>\n","protected":false},"excerpt":{"rendered":"<p>MEVA modernising with an eye on product quality and sustainability In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and [&hellip;]<\/p>\n","protected":false},"author":7,"featured_media":8556,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":[],"categories":[16],"tags":[],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO plugin v19.13 - https:\/\/yoast.com\/wordpress\/plugins\/seo\/ -->\n<title>Investing in the future - MEVA Caribbean<\/title>\n<meta name=\"description\" content=\"In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and sustainability.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"en_GB\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Investing in the future - MEVA Caribbean\" \/>\n<meta property=\"og:description\" content=\"In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and sustainability.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/meva.net\/en-cb\/investing-in-the-future\/\" \/>\n<meta property=\"og:site_name\" content=\"MEVA Caribbean\" \/>\n<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/MEVAlive\/\" \/>\n<meta property=\"article:published_time\" content=\"2022-05-12T10:13:56+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2022-05-12T10:17:16+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/meva.net\/en-asia\/wp-content\/uploads\/sites\/23\/2022\/05\/2022-03-09-News-Cleaning-Line-Teaser.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1920\" \/>\n\t<meta property=\"og:image:height\" content=\"500\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"krauss\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"krauss\" \/>\n\t<meta name=\"twitter:label2\" content=\"Estimated reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\/\/schema.org\",\"@graph\":[{\"@type\":\"WebPage\",\"@id\":\"https:\/\/meva.net\/en-cb\/investing-in-the-future\/\",\"url\":\"https:\/\/meva.net\/en-cb\/investing-in-the-future\/\",\"name\":\"Investing in the future - MEVA Caribbean\",\"isPartOf\":{\"@id\":\"https:\/\/meva.net\/en-cb\/#website\"},\"datePublished\":\"2022-05-12T10:13:56+00:00\",\"dateModified\":\"2022-05-12T10:17:16+00:00\",\"author\":{\"@id\":\"https:\/\/meva.net\/en-cb\/#\/schema\/person\/03eeb99b1f71d9813a35119432b2dc84\"},\"description\":\"In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and sustainability.\",\"breadcrumb\":{\"@id\":\"https:\/\/meva.net\/en-cb\/investing-in-the-future\/#breadcrumb\"},\"inLanguage\":\"en-GB\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\/\/meva.net\/en-cb\/investing-in-the-future\/\"]}]},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\/\/meva.net\/en-cb\/investing-in-the-future\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\/\/meva.net\/en-cb\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Investing in the future\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\/\/meva.net\/en-cb\/#website\",\"url\":\"https:\/\/meva.net\/en-cb\/\",\"name\":\"MEVA Caribbean\",\"description\":\"MEVA Formwork Systems, Asia Export Website\",\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\/\/meva.net\/en-cb\/?s={search_term_string}\"},\"query-input\":\"required name=search_term_string\"}],\"inLanguage\":\"en-GB\"},{\"@type\":\"Person\",\"@id\":\"https:\/\/meva.net\/en-cb\/#\/schema\/person\/03eeb99b1f71d9813a35119432b2dc84\",\"name\":\"krauss\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"en-GB\",\"@id\":\"https:\/\/meva.net\/en-cb\/#\/schema\/person\/image\/\",\"url\":\"https:\/\/secure.gravatar.com\/avatar\/3d0de82b3ee4ded46541f5eb5ba7a025?s=96&d=mm&r=g\",\"contentUrl\":\"https:\/\/secure.gravatar.com\/avatar\/3d0de82b3ee4ded46541f5eb5ba7a025?s=96&d=mm&r=g\",\"caption\":\"krauss\"}}]}<\/script>\n<!-- \/ Yoast SEO plugin. -->","yoast_head_json":{"title":"Investing in the future - MEVA Caribbean","description":"In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and sustainability.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"en_GB","og_type":"article","og_title":"Investing in the future - MEVA Caribbean","og_description":"In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and sustainability.","og_url":"https:\/\/meva.net\/en-cb\/investing-in-the-future\/","og_site_name":"MEVA Caribbean","article_publisher":"https:\/\/www.facebook.com\/MEVAlive\/","article_published_time":"2022-05-12T10:13:56+00:00","article_modified_time":"2022-05-12T10:17:16+00:00","og_image":[{"width":1920,"height":500,"url":"https:\/\/meva.net\/en-asia\/wp-content\/uploads\/sites\/23\/2022\/05\/2022-03-09-News-Cleaning-Line-Teaser.jpg","type":"image\/jpeg"}],"author":"krauss","twitter_card":"summary_large_image","twitter_misc":{"Written by":"krauss","Estimated reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"WebPage","@id":"https:\/\/meva.net\/en-cb\/investing-in-the-future\/","url":"https:\/\/meva.net\/en-cb\/investing-in-the-future\/","name":"Investing in the future - MEVA Caribbean","isPartOf":{"@id":"https:\/\/meva.net\/en-cb\/#website"},"datePublished":"2022-05-12T10:13:56+00:00","dateModified":"2022-05-12T10:17:16+00:00","author":{"@id":"https:\/\/meva.net\/en-cb\/#\/schema\/person\/03eeb99b1f71d9813a35119432b2dc84"},"description":"In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been comprehensively modernised through a \u20ac7 million investment in order to improve product quality, material availability and sustainability.","breadcrumb":{"@id":"https:\/\/meva.net\/en-cb\/investing-in-the-future\/#breadcrumb"},"inLanguage":"en-GB","potentialAction":[{"@type":"ReadAction","target":["https:\/\/meva.net\/en-cb\/investing-in-the-future\/"]}]},{"@type":"BreadcrumbList","@id":"https:\/\/meva.net\/en-cb\/investing-in-the-future\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/meva.net\/en-cb\/"},{"@type":"ListItem","position":2,"name":"Investing in the future"}]},{"@type":"WebSite","@id":"https:\/\/meva.net\/en-cb\/#website","url":"https:\/\/meva.net\/en-cb\/","name":"MEVA Caribbean","description":"MEVA Formwork Systems, Asia Export Website","potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/meva.net\/en-cb\/?s={search_term_string}"},"query-input":"required name=search_term_string"}],"inLanguage":"en-GB"},{"@type":"Person","@id":"https:\/\/meva.net\/en-cb\/#\/schema\/person\/03eeb99b1f71d9813a35119432b2dc84","name":"krauss","image":{"@type":"ImageObject","inLanguage":"en-GB","@id":"https:\/\/meva.net\/en-cb\/#\/schema\/person\/image\/","url":"https:\/\/secure.gravatar.com\/avatar\/3d0de82b3ee4ded46541f5eb5ba7a025?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/3d0de82b3ee4ded46541f5eb5ba7a025?s=96&d=mm&r=g","caption":"krauss"}}]}},"_links":{"self":[{"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/posts\/8555"}],"collection":[{"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/users\/7"}],"replies":[{"embeddable":true,"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/comments?post=8555"}],"version-history":[{"count":1,"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/posts\/8555\/revisions"}],"predecessor-version":[{"id":8557,"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/posts\/8555\/revisions\/8557"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/media\/8556"}],"wp:attachment":[{"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/media?parent=8555"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/categories?post=8555"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/meva.net\/en-cb\/wp-json\/wp\/v2\/tags?post=8555"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}