Why consider pre-assembly?

Increasing cost pressure, ever shorter implementation periods, limited space on the construction site, shortage of skilled labour or the complexity of special formwork. These common issues make factory pre-assembly of standard and special formwork, and ready-to-use delivery, an economically attractive alternative for construction companies.


MEVA’s pre-assembly service:

  • Precise and careful pre-assembly in the MEVA factory and by MEVA specialists enables better concreting results (e.g. special forms)
  • Pre-assembled formwork is produced on schedule according to the construction schedule and delivered to the construction site ready for instant use
  • Pre-assembly saves labour costs by shortening assembly times on site. Existing labour can be used for other tasks, thus increasing productivity
  • Shorter instruction of the site personnel and associated expenses thanks to pre-assembly
  • Return of the pre-assembled formwork elements for dismantling in the MEVA plant and thus rapid rent relief.

Formwork that has been pre-assembled offsite

Get in touch with our formwork services team.

These fields are required

This field is for validation purposes and should be left unchanged.

We offer a full range of Formwork Services

From planning and design to special formwork MEVA can help.

Close search and go back to site