Company News
News about MEVA as a global company, it’s staff, mission, vision, values and reputation as an innovative company established over 50 years.
Select your region:
„Services at the highest level“
The premises used by the MEVA subsidiary in Hungary had become too small. Hence, it has now moved to a new, spacious location in Budapest that has modern equipment and offices. Mihály Botta-Dukát, managing director of MEVA Hungary since...
Simply smart slab formwork
The requirements during slab construction are wide-ranging: in-situ concrete or prefabricated parts, small cellar ceilings up to surfaces with thousands of square metres, slab thicknesses, slab heights, challenging floor plans, compensations, architectural concrete requirements … all these factors mean...
Green electricity from sunlight
Generating renewable energy is a major factor in the Black Forest region in the south-west of Germany. MEVA is increasingly relying on photovoltaic (PV) systems as a clean way to produce electricity, as solar power can be produced directly...
MEVA at bauma 2022
After three-and-a-half years the construction industry is finally meeting up again: bauma 2022 will attract an international audience to Munich from October 24-30. MEVA will also be there and presenting smart products and solutions on 470 m² of exhibition space...
Investing in the future
MEVA modernising with an eye on product quality and sustainability In future, the new production and rental formwork reconditioning facilities at MEVA will be the state of the art. By the end of this year, they will have been...
Foundation formwork made even simpler
1981 saw MEVA unveil its novel “Alu-Wand + Decke” (“Alu Wall + Slab”) aluminium formwork system that combined unusually low weight with high stability. Now known as “AluFix”, the lightweight, crane-independent formwork has since seen a number of refinements...
Constructing the world’s most complex building
The Museum of the Future in Dubai, United Arab Emirates (UAE) has been dubbed the world’s most complex building, thanks to the unusual vertical torus shape and labyrinthine interiors. Recently completed in 2020, the curved shape presented an enormous...
Read the latest edition of the Professional Formwork News
The new Formwork Press has arrived! Read in our customer magazine how our partners face challenges in the implementation of concrete construction projects. Find out how MEVA’s clever solutions and technical innovations simplify work on your construction sites and...
MEVA acquires Acropol
Through purchase of the Acropol Group, MEVA Schalungs-Systeme GmbH from Haiterbach is strengthening its presence in Belgium and Luxembourg. The takeover of the formwork and shoring tower rental company with a 25-strong staff encompasses the sites at Landen/Belgium and...
50 years of MEVA – Pioneer and trendsetter
The young Gerhard Dingler had the right instincts 50 years ago when, seeing his future in construction, he founded DINGLER Baugeräte GmbH & Co. KG. He started off by selling and renting out cranes and other equipment but, by...